On Site Adding Oil Level Gauges for Transformer

During maintenance treatment for 16MVA power transformer it was found out that Main tank oil level gauge is missing.

Engis technical team made all arrangement in order to add the oil level gauge on site in the shortest time and for the customer satisfaction.

Before the start of the work the fire extinguishing system was tested and the transformer was washed

       

The oil was drained out from the conservator and the conservator cover was removed.

img_20160918_171106       img_20160918_170734

Input hole was opened in the cover for the oil level gage and the cover was installed back on the conservator.

img_20160918_151552   img_20160918_151622

 img_20160918_1554562

Oil gauge was installed and calibrate.

img_20160925_122809